Concrete calculator: cubic metres, cement, sand and gravel
Find the cubic metres of concrete for a slab, floor, footing, trench or column and the bags of cement, sand, gravel and water to mix it, with a waste margin.
Find the cubic metres of concrete you need for a slab, a floor, a trench, a footing or a column, how many trucks to order and, if you mix it yourself, how much cement, sand, gravel and water you need. Also the other way round: with the concrete you have, what thickness or length you can pour.
Volume
Multiply by the number of identical pieces and add a 5 to 10 % margin for uneven ground, formwork and what stays in the drum.
Materials per cubic metre
Guide mixes for site-mixed concrete with dry aggregate and CEM II 32.5 or 42.5 cement:
| Concrete | Cement | Sand | Gravel | Water |
|---|---|---|---|---|
| C20 plain (HM-20) | 275 kg (11 bags) | 760 kg | 1200 kg | 180 L |
| C25 reinforced (HA-25) | 325 kg (13 bags) | 720 kg | 1170 kg | 180 L |
| C30 reinforced (HA-30) | 375 kg (15 bags) | 690 kg | 1150 kg | 175 L |
The number is the characteristic strength in N/mm². With ready-mixed concrete the plant sets the mix for the strength, exposure class and consistency you order.
Worked example
6 × 4 m floor, 15 cm thick, plain C20 and a 5 % margin.
- V = 6 · 4 · 0.15 = 3.60 m³; with the margin, 3.78 m³: one truck.
- Site-mixed: cement 3.78 · 275 = 1040 kg (42 bags of 25 kg), sand 2.87 t, gravel 4.54 t and 680 L of water.
Good practice
- Do not add extra water to make it flow: each extra litre lowers the strength.
- Vibrate or rod the concrete to remove air, especially in columns and footings.
- Cure it: keep it moist for at least 7 days (longer in heat or wind) so it does not crack.
- Structural elements are defined by the design: this calculator measures volume, it does not size members.
Frequently asked questions
How many bags of cement in a cubic metre of concrete?
It depends on the strength: 11 to 15 bags of 25 kg (275 to 375 kg of cement). For site-mixed C25, about 13 bags, with about 720 kg of sand, 1170 kg of gravel and 180 L of water.
How thick should a floor slab be?
For foot traffic, 10 to 12 cm; for cars, 15 cm; for trucks or forklifts, 20 cm or more, with mesh. The ground below must be compacted and with a gravel sub-base.
How much margin do I add?
Between 5 and 10 %: the ground is never perfectly flat, the formwork spreads a little and some concrete always stays in the drum or the pump.
Ready-mixed or site-mixed?
For structure (slabs, footings, columns), ready-mixed: it arrives with guaranteed strength and its delivery note. Site mixing only makes sense for small amounts and non-structural elements.